Customization: | Available |
---|---|
After-sales Service: | Video Technical Support, Online Engineer Support |
Warranty: | 5 Year |
Still deciding? Get samples of US$ 10/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Autoclave molding is a type of closed molding manufacturing. Closed molding processes involve curing raw materials inside a two-sided mold or a deoxygenated vacuum bag. These processes can produce enormous volumes of material, making them most suitable for large facilities.
The manufacture of composite autoclaves requires advanced components, attention to detail, and strict adherence to quality control standards. Our dedicated team of design, production, and quality control personnel dedicate themselves to the highest level of performance in producing composite autoclaves that perform according to the specifications of our clients.Using an autoclave for manufacturing ensures consistent polymer hardening, making it an excellent tool for composite manufacturing.
Effective Curing Diameter | φ2000-3000mm |
Shell Length | 2400-3500mm |
Effective Curing Length | According To The Product,Tooling And Yield Selection |
Maximum Operating Pressure | 0.6-4.0MPa |
Maximum Operating Temperature | 160-400ºC |
Number of Vacuum Channels | According To Demand |
Number of Thermocouple Routes | Specify As Required |
Control System | Host Computer +PLC Logic |
Temperature Control Accuracy | ≤±1ºC |
Temperature Uniformity | ≤±2ºC |
Rising and Cooling Rate | 0-6ºC/min Adjustable |
Pressure Lifting Rate | 0-0.1MPa/min Adjustable |
Cooling Method | Circulating Water Cooling |
Heating Method | Electric Heat Pipe Heating |
Q1:Are you a factory or a trading company ?
A1:We are the factory, located in Shandong. Expecting your visit at anytime.
Q2:How long is the delivery time of bulk orders ?
A2:Bulk order lead time: About 35 working days.
Q3: How to pay?
A3:We try to make all payment methods as much as feasible. TT and L/C are acceptable and TT will be more appreciated.
Q4: What is your advantage ?
A4:We also have professional technical team in designing and producing which can meet different requirements from customers, we offer 24 hours pre-sales and after-sales support, to ensure in-time communication between clients and us.
Q5: Is the price on your website is the closing price ?
A5:No, it is just for your reference, an exact quotation based on your requirement Please contact us for details.
Q6: May I inspect before delivery?
A6:Sure, welcome to inspect before delivery.And if you can't inspect by yourself,
our factory has a professional quality inspection team to inspect the goods
before shipment to ensure quality.